|
K.H. Butler Boat Launch and Parking FacilityODNR
- Design of $1.5M recreational boating and fishing facility along the Ohio River
- Ramps and parking facilities were designed to meet ADA regulations
- Electrical design included coordination of service with the local utility, site lighting, a marine pedestal and service to a navigational light
|
|
Highbanks Metropolitan ParkFranklin County Metro Parks
- $800,000 project
-
- Three miles of roadway, two bridges, eight separate parking areas
-
- Included single-span laminated timber arch bridge with wooden deck
-
- Design for several different bridges over a ten-year period
-
- Included design of three-span timber bridge across ravine
-
- Others included bridges on various nature trails
|
|
Caesar Creek State ParkODNR
- $600,000 project
- Construction observation services for boat launch facility
- Included waterline, sanitary services, concrete ramp and floating dock
|
|
Alum Creek State ParkODNR
- $2.7 million project
- 3.000 ft. of beach and 1,920-vehicle parking lot
|
|
Deer Creek State ParkODNR
- Designed 1,700-vehicle parking lot
- $700,000 project included catch basins and storm sewer system
|
|
Chestnut Ridge Metropolitan ParkFranklin County Metro Parks
- Designed entrance drive and parking lot
- Park features include 486 acres of woodlands, fields, hiking trails and picnic areas
|
|
West Spillway Replacement Grand Lake St. Mary’sODNR
- $4.6 million project to design new spillway
- 500-ft-long concrete ogee spillway
- 80-ft. prestressed box beam bridge over spillway
- Also included concrete floodwall, sidewalk, dumped rock facing, parking lot and access road
|
|
Blacklick Woods Metropolitan Park Golf CourseFranklin County Metro Parks
- Design of four cart paths over Blacklick Creek and Pond
- Arched steel beam bridges with oak plank deck on stub abutments
|
|
McConnellsville Boat Launch/Parking FacilityODNR
- Checked shop drawings and provided field inspection on this $1M project on the Muskingum River in southeastern Ohio
- New facility features a two-lane concrete boat launching ramp and parking facilities, new public restrooms and a lighted shelter building.
- All facilities are handicapped accessible and are designed to withstand flooding.
|