Jesse Owens Track Stadium – The Ohio State University

  • Included siting the track, layout, grading, site drainage and storm sewer system
  • Parking for approximately 400 vehicles

Oval Restoration—The Ohio State University

  • Jones-Stuckey provided civil engineering on Design Team that included a Landscape Architect, Civil Consultant, and Irrigation Consultant for $550,000 project
  • Civil work included alternative water sources for irrigation for evaluation; modeling existing system with flow test data; waterline connection from main line to irrigation system; design for meter, backflow preventer, and irrigation flow controller; coordination with Hagerty Hall Restoration project; and Construction administration services

St. John Arena Parking Lot Renovation—The Ohio State University

  • $1.5M improvement project included lighted parking for 1,000 vehicles
  • Pavement reclamation and storm sewer improvements, and extensive concrete pavement for pedestrian walkways that will also act as heavy vehicle parking for St. John Arena
  • Project completed on accelerated schedule limiting construction to summer quarter to accommodate parking for fall sporting events

Site Development / Improvements

  • Synthetic Turf Field—The Ohio State University
  • Irrigation Water Source Study — The Ohio State University
  • Golf Course Water Service—The Ohio State University
  • Scarlet Course Rebuild—The Ohio State University
  • Recreation Intramural Sports Fields—The Ohio State University
  • Varsity Tennis Courts (North of Hayes Indoor Practice Facility)—The Ohio State University
  • Ohio Stadium Turf Replacement—The Ohio State University
  • Fyffe Road extension, storm sewers and two retention basins— The Ohio State University
  • Civil / Site Engineering and Parking — Wellington School, Columbus, OH
  • McCracken Power Plant Emissions Compliance Project— The Ohio State University

12th Avenue Parking Lot – The Ohio State University

  • Plans and specifications
  • New parking lot on OSU Main Campus
  • Included a special concrete pad parking area for the Hospital’s Mobile Mammography bus

Larkins Hall Replacement — The Ohio State University

  • $100M replacement of recreational sports facility
  • Included site survey; all waterlines, storm and sanitary sewers; all approaching roadways, building parking and service access pavements; stormwater analysis; four soccer fields and 15 tennis courts

Fountain Square Parking Lot and Site Improvements—ODNR

  • $3.5 Million project completed in two phases
  • Phase I involved providing construction administration and on-site representation for a parking facility designed by others
  • Phase II consisted of a revised entrance road, connections to the Phase I parking lot, improvement plan for the North parking lots, design of a new guard house, improvements to the South parking lots, and security upgrades for the entire complex
  • Security features include perimeter fencing and electronically controlled gating system, controlled-entry guard house outfitted with bullet-proof glass, security lighting

Contact Us | About Us | Our Services | Career Opportunities | FTP Site | Current Projects

© 2006 Jones-Stuckey Ltd., Inc. All Rights Reserved.
2323 West Fifth Ave., Suite 160, Columbus Ohio, 43204
Phone: 614-486-0401 Fax: 614-486-1194