Jesse Owens Track Stadium The Ohio State University
- Included siting the track, layout, grading, site drainage and storm sewer system
- Parking for approximately 400 vehicles
|
|
Oval RestorationThe Ohio State University
- Jones-Stuckey provided civil engineering on Design Team that included a Landscape Architect, Civil Consultant, and Irrigation Consultant for $550,000 project
- Civil work included alternative water sources for irrigation for evaluation; modeling existing system with flow test data; waterline connection from main line to irrigation system; design for meter, backflow preventer, and irrigation flow controller; coordination with Hagerty Hall Restoration project; and Construction administration services
|
|
St. John Arena Parking Lot RenovationThe Ohio State University
- $1.5M improvement project included lighted parking for 1,000 vehicles
- Pavement reclamation and storm sewer improvements, and extensive concrete pavement for pedestrian walkways that will also act as heavy vehicle parking for St. John Arena
- Project completed on accelerated schedule limiting construction to summer quarter to accommodate parking for fall sporting events
|
|
Site Development / Improvements
- Synthetic Turf FieldThe Ohio State University
- Irrigation Water Source Study The Ohio State University
- Golf Course Water ServiceThe Ohio State University
- Scarlet Course RebuildThe Ohio State University
- Recreation Intramural Sports FieldsThe Ohio State University
- Varsity Tennis Courts (North of Hayes Indoor Practice Facility)The Ohio State University
- Ohio Stadium Turf ReplacementThe Ohio State University
- Fyffe Road extension, storm sewers and two retention basins The Ohio State University
- Civil / Site Engineering and Parking Wellington School, Columbus, OH
- McCracken Power Plant Emissions Compliance Project The Ohio State University
|
|
12th Avenue Parking Lot The Ohio State University
- Plans and specifications
- New parking lot on OSU Main Campus
- Included a special concrete pad parking area for the Hospital’s Mobile Mammography bus
|
|
Larkins Hall Replacement The Ohio State University
- $100M replacement of recreational sports facility
- Included site survey; all waterlines, storm and sanitary sewers; all approaching roadways, building parking and service access pavements; stormwater analysis; four soccer fields and 15 tennis courts
|
|
Fountain Square Parking Lot and Site ImprovementsODNR
- $3.5 Million project completed in two phases
- Phase I involved providing construction administration and on-site representation for a parking facility designed by others
- Phase II consisted of a revised entrance road, connections to the Phase I parking lot, improvement plan for the North parking lots, design of a new guard house, improvements to the South parking lots, and security upgrades for the entire complex
- Security features include perimeter fencing and electronically controlled gating system, controlled-entry guard house outfitted with bullet-proof glass, security lighting
|
|
|